CAPSTONE Microturbine


| Contract | EPCIC |
| Client | Sarawak SHELL |
| Project & Location | Provision of Engineering, Procurement, Construction, Installation and Commissioning of Microturbine at Shell F28, Sarawak Offshore. |
| System Type | C65 HPNG |
| Year | 2019 |


| Contract | EPCIC |
| Client | Sarawak SHELL |
| Project & Location | Provision of Engineering, Procurement, Construction, Installation and Commissioning of Microturbine at Shell F28, Sarawak Offshore. |
| System Type | C65 HPNG |
| Year | 2018 |


| Contract | EPCIC |
| Client | Petronas Carigali Sdn. Bhd. |
| Project & Location | Provision of Engineering, Procurement, Construction, Installation and Commissioning of Microturbine at Kinabalu KNJT-C, Offshore Sarawak. |
| System Type | C200 HPNG |
| Year | 2013 |


| Contract | EPCIC |
| Client | Petronas Carigali Sdn. Bhd. |
| Project & Location | Provision of Engineering, Procurement, Construction, Installation and Commissioning of Microturbine at Bekok B, Sarawak Offshore. |
| System Type | C30 HPNG |
| Year | 2008 |

| Contract | EPCIC |
| Client | SHELL Sarawak / SEA Hibiscus Sdn. Bhd. |
| Project & Location | Provision of Engineering, Procurement, Construction, Installation and Commissioning of Microturbine at South Furious Jacket-E (SFJT-E), Offshore Sabah |
| System Type | C65 HPNG |
| Year | 2010 |
Electrical & Others


| Project Reference | Bio-filter sewage treatment plant |
| Owner | Indah Water Konsortium (IWK), Loji Semenyih |
| Project Description | To Design, Supply, Fabricate, Install, Testing &Commissioning MCCPanel & Instrument panel c/w earthing system protection. |


| Project Reference | Ladang Tenamaram Sewage Treatment Plant |
| Owner | IWK Loji Tenamaram Batang Berjuntai / SIME DARBY Plantation Berhad |
| Project Description | M&E Works – To Fabricate, Supply, Deliver, Install, Testing & Commissioning of electrical wiring, blower & pump starter control, piping system & other related mechanical system installation |


| Project Reference | BLUESCOPE Cooling Tower Treatment |
| Owner | NS BLUESCOPE MALAYSIA SDN BHD |
| Project Description | Chiller Water Chemical Dosing Automatic Pump Control – Australia Standard (AS3000) |


| Project Reference | TENAGA NASIONAL air-conditioning smart control system starter panel |
| Owner | TENAGA NASIONAL BERHAD |
| Project Description | Smart Control System Air-Conditioning Starter for scada control room sub-station (Klang Valley – 18 sites |


| Project Reference | LV Switchboard ELR/EFR calibration & preventive maintenance |
| Owner | Sunway Club Berhad & Sunway Machinery Sdn Bhd / Villa Makmur Condominium Dutamas / Andalucia Condominium Pantai Hillpark |
| Project Description | LV Switchboard Capbank Upgrading, EFOC/ELR/EFR Calibration & Preventive Maintenance |
![]()

| Project Reference | Motor Control Center (MCC) & PLC/DCS Interface Panel |
| Owner | Tioxide (M) Sdn Bhd, Kemaman (Formerly Known As HUNSTMAN) |
| Project Description | MCC & PLC Interface Panel To DCS Emerson. |


| Project Reference | Motor Control Center (MCC) & PLC/DCS Interface Panel |
| Owner | KBC Bitumen Company Sdn Bhd, Kemaman. |
| Project Description | MCC & PLC Interface Panel To DCS Yokogawa. |


| Project Reference | Motor Control Center (MCC). |
| Owner | SKAKO MIXER (FRANCE) / PROJALMA (SINGAPORE) SDN BHD. |
| Project Description | MCC PANEL C/W PLC CONTROL PANEL. |


| Project Reference | Cadangan Kerja-Kerja Ubahsuai Dan Menyiapkan Bilik ‘Disaster Recovery Center’ Baru Serta Lain-Lain Kerja Yang Berkaitan Di Suite 1.1f, Aras 11 Block A, Kompleks Pejabat Kedutaan, Presint Diplomatik, W.Persekutuan. |
| Owner | Perbadanan Putrajaya (PJC). |
| Project Description | To Design, Fabricate, Install, Testing & Commissioing Of LV Switchboard, Air-Conditioning Starter Panel And Electrical Wiring & Installation |
Get in touch
Please don’t hesitate to complete the form below if you want to discuss ways we can help you reach your objectives.
1
Step 1
keyboard_arrow_leftPrevious
Nextkeyboard_arrow_right

