Electricals & Others
We offer you one-stop production process from initial concept to the final finished, which a complete package to your specific requirement from design, costing, fabrication, installation, wiring, testing, commissioning and transporting. We are also providing service of upgrade and modify of existing system, component, wiring and control system on site for various industries
No. | Project | Client | Year |
1 | To supply & install underfloor truncking and network cable | Menara Mara K.Lumpur | 2013 |
2 | To design, fabricate, supply, install, testing & comissioning of sub-station scada server room air-cond starter panel c/w plc auto temperature control | Tenaga Nasional Berhad | 2013 |
3 | Design & built audio visual room, project management & supervision | Risda Ampang K.Lumpur | 2013 |
4 | To supply & install hostel electrical sub-db, metering panel, power, lighting & air-conditioning | Tylor College Subang Jaya | 2013 |
5 | Re-instatement works at wisma consplant s.jaya, project management & supervision | Permodalan Hartanah Berhad | 2013 |
6 | Office renovation at phb hq paremba square subang, project manage-ment & supervision | Permodalan Hartanah Berhad | 2013 |
7 | To supply, install & wiring grand saga tol office bt 11 intercom, door access and alarm system | Grand Saga Sdn Bhd | 2013 |
8 | To supply & install building lightning protection | National Feedlot Melaka | 2013 |
9 | To design, fabricate, supply, install, testing & comissioning of transfer pump starter control panel c/w automatic plc pressure control | JMC Kelana Puteri Condo, Kelana Jaya | 2013 |
10 | To design, fabricate, supply, install, testing & commissioning of cooling tower fan motor starter panel | Mycron Steel berhad | 2013 |
11 | To design, fabricate, supply, install, testing & commissioning of actuator control panel | Maruwa (Malaysia) Sdn Bhd, Melaka | 2013 |
12 | To design, fabricate, supply, install, testing & commissioning of pool pump control panel | Mascerena Palm Putra Heights | 2013 |
13 | To supply & install wad 2c door accsess & cctv system | Hospital Selayang | 2013 |
14 | To design, fabricate, supply, install, testing & commissioning loji bt 11 Stirrer motor control panel | Puncak Niaga (M) Sdn Bhd | 2013 |
15 | LV switchboard preventive maintenance & calibration works | Sunway Club | 2013 |
16 | LV switchboard preventive maintenance | Sunway Machinery | 2013 |
17 | To design, fabricate, install, testing & commissioning of micro-turbine interface relay panel | Uniten Research Centre | 2014 |
18 | To design, fabricate, supply, install, testing & commissioning of automatic dosing pump & cooling tower motor control panel | Ns Bluescope Malaysia Sdn Bhd, Kapar Klang | 2014 |
19 | To design, fabricate, supply, install, testing & commissioning of diesel starter control panel | Jaring Metal Industries Sdn Bhd | 2014 |
20 | To design, fabricate, supply, install, testing& commissioning of automatic heater starter control panel | Jaring Metal Industries Sdn Bhd | 2014 |